Fouré Lagadec seminar: Safety at the heart of our business.

All Fouré Lagadec managers gathered around a central and fundamental theme: safety. Read the article

Discover our articles

  • ACM Delivers Two ESPN Heat Exchangers to EDF

    ACM has just delivered two Level 2 and 3 Nuclear Pressure Vessels (NPVs) for French 900 MW nuclear power plants: a RCV heat exchanger for the primary loop and a TEU heat exchanger for spent water treatment, both manufactured in accordance with the RCC-M code.

    Read the article
  • Ministerial visit to our Le Havre site: health, safety, and training were the focus of the discussions.

    We had the honor of welcoming Mr. Jean-Pierre Farandou, Minister of Labor and Solidarity, to our Fouré Lagadec site in Le Havre for a visit focused on occupational health and safety.

    Read the article
  • Paroles de Femmes 2026: discover Delphine's story - Branch Manager in Grenoble

    Through the "Paroles de Femmes" series, the Snef Group is highlighting the women who, within its subsidiaries, contribute every day to the development of our businesses and our expertise.

    Read the article
  • North Atlantic unit shutdown: teams mobilized.

    With this in mind, our mechanical engineering, Seine-Estuaire and TMT Industrie teams are working alongside our customer North Atlantic to prepare for the next shutdown.

    Read the article
  • ACM approves expansion of Jonage site

    In line with its commitment to the industry, ACM is launching phase 2 of its Jonage site.

    Read the article
  • Visit by Mr Louis Le Franc, Prefect of Finistère, to Fouré Lagadec Brest.

    On Wednesday February 11, 2026, Louis Le Franc, Prefect of Finistère, visited Fouré Lagadec in Brest, a subsidiary of Groupe Snef, a recognized player in shipbuilding and repair.

    Read the article
  • Fouré Lagadec seminar: Safety at the heart of our business.

    All Fouré Lagadec managers gathered around a central and fundamental theme: safety.

    Read the article
  • A look back at the operations carried out by Fouré Lagadec during the 2025 technical shutdown for Naphtachimie at the Lavera site.

    During this operation, numerous actions were carried out, including dismantling, levelling, lifting, assembly, welding, cleaning, insulating and de-laminating.

    Read the article
  • A look back at the Fouré Lagadec safety day

    Throughout November, all Fouré Lagadec branches organized a safety day dedicated to work at height, a major challenge in our business.

    Read the article