Energies

Hydropower, solar power, wind power, Environment, waste management, water Wood, paper, biomass

At the heart of the energy transition, Fouré Lagadec supports its customers in the design, modernization and optimization of their installations.

We work across all sectors—hydropower, solar, wind, waste-to-energy, water, wood, paper, and biomass—to develop sustainable solutions tailored to environmental challenges.

Engineering & equipment design

We design industrial equipment and systems tailored to the specific needs of energy facilities.

  • Design and Sizing

  • Manufacturing of complex equipment

  • Integration into existing facilities

Maintenance engineering

Our engineers apply their technical expertise to industrial facilities by designing customized maintenance solutions tailored to each client’s specific operational needs. From analysis to implementation, we help improve equipment reliability and availability.

  • Maintenance Strategies

  • Shutdown Planning and Management

  • Optimization and modernization of facilities

Representation of a hydroelectric dam with the positioning of intervention points by Fouré Lagadec.

Some examples of hydroelectricity projects

  1. Dismantling of gantry structures

  2. Inspection of hard-to-reach areas

  3. Maintenance of door seals

  4. Design, fabrication, and integration of drain piping - SS4-certified personnel

  5. Design, fabrication, and integration of hydro-ejector piping

  6. Reconditioning of fittings, valves, and gate valves

  7. Ball valve water assembly

  8. Heavy mechanical maintenance

Gantry dismantling Downstream unloader valve

Project management, from planning to completion - Personnel authorized to work with lead hazards - Hydromechanical assembly

Installation of a biomass boiler and connection to the existing plant.

Manufacture and integration of stainless steel piping for water treatment plant projects.

Hydroejector piping

Project management - Supervision of work in difficult access areas (rope access, confined spaces) - Piping removal - Design and construction of new piping system and associated boilerwork - Re-installation of all equipment. Design and construction of new piping network and ancillary boilermade equipment - Installation of all new equipment

Production of a terrestrial prototype - 50-meter diameter vertical axis wind turbine.

Optimization of the autoclave roller coating process: an intervention to make the temperature maintenance system more reliable by replacing the copper coils.

Are you developing or modernizing an energy system?