As part of a maintenance project, TotalEnergies commissioned Fouré Lagadec to replace a 180-ton, 25-meter-tall heat exchanger—a major technical challenge in a complex and constrained environment.
🎯 Expertise, precision, and safety
Our teams drew on their expertise in shutdown engineering, from meticulous preparation to on-site operations coordination. This involved proactive planning and collaboration with all project stakeholders—the client, subcontractors, and suppliers—to ensure the shutdown’s success and the facilities’ long-term performance.
👷♂️ A large-scale project
150 people mobilized, a customized operational strategy, heavy and complex operations carried out with rigor, and quality and safety checks at every stage. Every detail counts, because safety is more than a priority: it is a fundamental value at Fouré Lagadec.
𝘋𝘦𝘱𝘶𝘪𝘴 𝘱𝘭𝘶𝘴 𝘥’𝘶𝘯 𝘴𝘪𝘦̀𝘤𝘭𝘦, 𝘍𝘰𝘶𝘳𝘦́ 𝘓𝘢𝘨𝘢𝘥𝘦𝘤 𝘢𝘤𝘤𝘰𝘮𝘱𝘢𝘨𝘯𝘦 𝘭𝘦𝘴 𝘢𝘤𝘵𝘦𝘶𝘳𝘴 𝘪𝘯𝘥𝘶𝘴𝘵𝘳𝘪𝘦𝘭𝘴 𝘥𝘢𝘯𝘴 𝘭𝘦𝘶𝘳𝘴 𝘱𝘳𝘰𝘫𝘦𝘵𝘴 𝘭𝘦𝘴 𝘱𝘭𝘶𝘴 𝘦𝘹𝘪𝘨𝘦𝘢𝘯𝘵𝘴, 𝘢𝘶 𝘴𝘦𝘳𝘷𝘪𝘤𝘦 𝘥𝘦 𝘭𝘢 𝘱𝘦𝘳𝘧𝘰𝘳𝘮𝘢𝘯𝘤𝘦, 𝘥𝘦 𝘭𝘢 𝘥𝘦́𝘤𝘢𝘳𝘣𝘰𝘯𝘢𝘵𝘪𝘰𝘯 𝘦𝘵 𝘥𝘦 𝘭𝘢 𝘮𝘢𝘪𝘯𝘵𝘦𝘯𝘢𝘯𝘤𝘦 𝘥𝘦𝘴 𝘪𝘯𝘴𝘵𝘢𝘭𝘭𝘢𝘵𝘪𝘰𝘯𝘴.



